YOU ARE HERE : PROJECTS DONE
 
 
E-mail Print

Project : Disputed points On Non Productive Times (NPT) Between  Schlumberger & Petroiran

To Prepare : Study & Judgment Reports

Bidder : Petroiran

Project Description :

  • -          Black Gold Services has been selected by Petroiran as a third party company to investigate and judge on the 1,400,000 US$ Schlumberger’s drilling management invoices to reduce the Non Productive Time(NPT), which were disputed between both parties.
  • -          BGS Engineering Department in a team work with Schlumberger selected third party categorized all disputed points in six sections. After reviewing the all operational reports and investigating disputed points in clarification meetings with involved operational people BGS judge on all disputed items by preparing two detailed technical reports. All BGS judgments which reduced the invoices value from :
  • -          1,400,000 to 400,000 US$, have been approved by Schlumberger’s selected third party as well.